Ship Depot Maintenance
|
$664M increase due to revised man-day rates, material costs, and notional ship availability increases based on revised PR-03 BAM requirement and schedule changes. |
Aircraft Depot Maintenance![]() |
FY02 submit funded program to goal: 100% for deployed squadrons and 90% for non-deployed squadrons. |
Ship Operations![]() |
FY02 program incorporates prior year usage of fuel and spare parts. Program estimate based on predicting usage by ship class. |
Flying Hour Program
|
$782M increase addresses anticipated 8% AVDLR increase from FY01 for all Type/Model/Series aircraft. AVDLR usage increase due to aging aircraft is the primary driver for FY01 and FY02 increases. |
Aviation Procurement Navy (APN)-6 Spares
|
Historically budgeted to 85% of requirement with expectation that 100% would be achieved during execution. Data indicates that expectations were not being met. In FY02, budget was increased to 94% to improve readiness with focus on aviation spares. |
Base Operating Support (BOS)
|
FY02 budget reflects most recent pricing of utilities, BOS contracts, and leases. Addresses emerging, mandatory and unbudgeted issues which occurred in FY01 and carried into FY02. |
Real Property Maintenance
|
FY02 goal is 2% Asset Protection Index. No additional funding required in FY02 to meet goal. Industry standard is 2% to 4% with industry average at 3.5%. |
| Program Related Engineering/ Program Related Logistics
|
FY02 budget reflects an increase of $106M. Designed to restrain/reverse FHP cost increases through logistics, engineering studies, and engineering changes. Provides means to mitigate aging aircraft repair and increasing AVDLR costs. |
Total Readiness Increases
|
FY02 Amended Budget compared to FY01 reflects an increase of $3.4 billion for readiness. |