Navy's Newest Carrier Successfully Completes Acceptance Sea Trials


Story Number: NNS090409-10Release Date: 4/9/2009 3:41:00 PM
A  A  A   Email this story to a friend   Print this story
By Program Executive Office Carriers

WASHINGTON (NNS) -- USS George H.W. Bush (CVN 77) successfully completed acceptance sea trials April 7-9 off the Virginia Capes and is in final preparation for delivery. Acceptance sea trials are the final test of the ship's readiness to begin fleet service.

Navy representatives from the U.S. Navy Board of Inspection and Survey tested and evaluated the ship's systems and performance. Acceptance trials will formally conclude April 10.

George H.W. Bush is the nation's 10th, and final, Nimitz-class carrier. The ship is designed to carry all current and future aircraft in her embarked air wing until the completion of her service life in approximately 2059.

George H. W. Bush incorporates numerous design improvements to reduce operating cost, enhance operational effectiveness and protect the environment. These include newly designed propellers, a new underwater hull-coating system, advanced waste disposal systems, a new JP-5 (jet propellant) distribution system, and modernized aircraft launch and recovery equipment. Improved medical and dental facilities have been included in the ship to enhance quality of life. George H.W. Bush also has a new composite mast that reduces topside weight and maintenance.

George H.W. Bush incorporates a modernized island, bulbous bow design and three-wire arresting gear configuration, first introduced on USS Ronald Reagan (CVN 76).

The ship's keel was laid Sept. 6, 2003, at Northrop Grumman Shipbuilding-Newport News. Dorothy Bush Koch, daughter of former President George H.W. Bush, served as the ship's sponsor during its christening on Oct. 7, 2006. The ship was commissioned Jan. 10, 2009, at Norfolk Naval Base. USS George H.W. Bush is commanded by Capt. DeWolfe H. Miller III. Upon delivery to the Navy, the ship will conduct post delivery maintenance before commencing training for operational deployment in 2010.

For more news from Naval Sea Systems Command, visit www.navy.mil/local/navsea/.

Comment submission for this story is now closed.
 
RELATED PHOTOS
Senior Chief Quartermaster Perry Everix plots the ship's course aboard the ircraft carrier USS George H.W. Bush (CVN 77) as the ship makes her way out of port for Builder's Sea Trials.
Official U.S. Navy file photo.
February 18, 2009
RELATED CONTENT
Navy Social Media
Sign up for email updates To sign up for updates or to access your subscriber preferences, please click on the envelope icon in the page header above or click here.