Navy Announces Successful Test of Electromagnetic Catapult on CVN 78


Story Number: NNS150515-18Release Date: 5/15/2015 4:05:00 PM
A  A  A   Email this story to a friend   Print this story
From PEO Carriers Public Affairs

WASHINGTON (NNS) -- The Navy conducted the first-ever, shipboard, full-speed catapult shots using the Electromagnetic Aircraft Launch System (EMALS) aboard the aircraft carrier Pre-Commissioning Unit (PCU) Gerald R. Ford (CVN 78), Naval Sea Systems Command announced May 15.

EMALS is a carrier-based launch system designed to expand the operational capability of the Navy's future carriers to include all current and future planned carrier aircraft. The recent test shots, known as "no-loads" because no aircraft or other loads were attached to the launching shuttle, successfully demonstrated the integrated catapult system. Using electromagnetic technology, the system delivers substantial improvements in system maintenance, increased reliability and efficiency, higher-launch energy capacity, and more accurate end-speed control, with a smooth acceleration at both high and low speeds. By allowing linear acceleration over time, electromagnetic catapults also place less stress on the aircraft.

"This is a very exciting time for the Navy," said Program Executive Officer for Aircraft Carriers Rear Adm. Tom Moore. "For the first time in over 60 years, we've just conducted 22 no load test shots using electricity instead of steam technology."

During the tests, generators within the ship produced an electric pulse, which was passed through power conditioning electronics to linear motors just below the flight deck surface. This energy allowed for the linear motors to propel the launching shuttle down the catapult track in excess of 180 knots before bringing the shuttle to a stop at the end of the track.

The next phase of EMALS testing, scheduled for this summer, will involve launching "dead-loads" off of the bow of CVN 78 into the James River. "Dead-loads" are large, wheeled, steel vessels weighing up to 80,000 pounds to simulate the weight of actual aircraft. The dead-loads will be launched from each catapult using a specific test sequence to verify that the catapult and its components are operating satisfactorily.

To date PCU Gerald R. Ford is 90 percent complete and 1550 Sailors have reported for introduction and training. CVN 78 will be commissioned in March 2016.

For more news from Naval Sea Systems Command, visit www.navy.mil/local/navsea/.

 
RELATED PHOTOS
The aircraft carrier Pre-Commissioning Unit Gerald R. Ford (CVN 78) transits the James River during the ship's launch and transit to Newport News Shipyard pier three for the final stages of construction and testing.
131117-N-DO831-080 NEWPORT NEWS, Va. (Nov. 17, 2013) The aircraft carrier Pre-Commissioning Unit Gerald R. Ford (CVN 78) transits the James River during the ship's launch and transit to Newport News Shipyard pier three for the final stages of construction and testing. Ford was christened Nov. 9, 2013, and is under construction at Huntington Ingalls Industries Newport News Shipyard. (U.S. Navy photo by Mass Communication Specialist Second Class Aidan P. Campbell/Released)
November 20, 2013
Navy Social Media
Sign up for email updates To sign up for updates or to access your subscriber preferences, please click on the envelope icon in the page header above or click Subscribe to Navy News Service.