View Image

A mass of cables and hoses on the pier provide power and water to USS Essex (LHD 2) as the ship begins an 18-month maintenance period.
121031-N-ZC343-522
SAN DIEGO (Oct. 31, 2012) A mass of cables and hoses on the pier provide power and water to USS Essex (LHD 2) as the ship begins an 18-month maintenance period. (U.S. Navy photo by Senior Chief Mass Communication Specialist Joe Kane/Released)

Download High Resolution

Go Back